Search

Chili System

GD Land Office

7 August

GD Land Office

Project: GD LAND OFFICE Style of project: delimotion, renew. Add: Bitexco Building, Dist 1, HCMC.  Area: 75m2 Items of construction: design, delimotion, ceiling & wall plaster, paint, electric system, lighting, carpet tile, office furniture, furniture, glass partition, projetor, fingerprint lock, glass sheet, logo sign, decor sign. Design & Construction: JDK CO LTD., Time of construction: […]

Read More
Framas Korea Vina

7 August

Framas Korea Vina

Project: Framas Korea Vina Style of project: demolition, renew. Add: Long Thanh Industrial Park, Dong Nai Area: 350m2. Items of Construction: design, demolition, plaster ceiling, wall paint, floor tile, glass inox frame, automatic glass door, electric system, air conditioner system, sanitary equipment, office furrniture, furniture Laminate An Cường, ABS door, Glass sheet, logo sign. Design […]

Read More
Shinwoo Vina Office

7 August

Shinwoo Vina Office

Project: Shinwoo Vina – Office Style of Project: Tháo dỡ toàn bộ, cải tạo mới. Add: Binh Duong Area: 200m2. Items of construction: design, construction, plaster ceiling, wall paint, floor tile, aluminium glass, office furniture, furniture, electric system, water supply system, sanitary equipment. Design & Constructon: JDK CO LTD., Time of construction: 11/2018 (30 days).

Read More

To top